4.0 Article

Mining above and below ground: timing the transition

Related references

Note: Only part of the references are listed.
Article Mining & Mineral Processing

Mixed integer linear programming formulations for open pit production scheduling

H. Askari-Nasab et al.

JOURNAL OF MINING SCIENCE (2012)

Article Management

Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines

Rafael Epstein et al.

OPERATIONS RESEARCH (2012)

Review Management

A Review of Operations Research in Mine Planning

Alexandra M. Newman et al.

INTERFACES (2010)

Article Computer Science, Theory & Methods

Finding the k Shortest Simple Paths: A New Algorithm and Its Implementation

John Hershberger et al.

ACM TRANSACTIONS ON ALGORITHMS (2007)

Article Management

Using aggregation to optimize long-term production planning at an underground mine

Alexandra M. Newman et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)

Article Automation & Control Systems

Receding horizon control applied to optimal mine planning

Graham C. Goodwin et al.

AUTOMATICA (2006)

Article Engineering, Multidisciplinary

Cost optimisation for underground mining networks

M Brazil et al.

OPTIMIZATION AND ENGINEERING (2005)

Article Engineering, Industrial

The long-term mine production scheduling problem

SC Sarin et al.

IIE TRANSACTIONS (2005)

Article Mining & Mineral Processing

Optimising declines in underground mines

M Brazil et al.

TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY (2003)

Article Operations Research & Management Science

An application of Branch and Cut to open pit mine scheduling

L Caccetta et al.

JOURNAL OF GLOBAL OPTIMIZATION (2003)

Article Metallurgy & Metallurgical Engineering

Optimization principle of combined surface and underground mining and its applications

JH Chen et al.

JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY (2003)