Journal
IET GENERATION TRANSMISSION & DISTRIBUTION
Volume 6, Issue 9, Pages 914-921Publisher
INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2011.0810
Keywords
-
Categories
Funding
- Intelligent Electric Power Grid Key Laboratory of Sichuan Province
- Hong Kong RGC GRF [515110]
Ask authors/readers for more resources
Maintaining frequency stability is one of the three dynamic security requirements in power system operations. As an emergency control, event-driven load shedding (ELS), which is determined preventively and triggered immediately after fault occurrence, can effectively prevent frequency instability. This study proposes a methodology for real-time predicting required ELS against severe contingency events. The general idea is to train an extreme learning machine-based prediction model with a strategically prepared ELS database, and apply it on-line for real-time ELS prediction. The methodology can overcome the shortcomings of conventional deterministic approaches by its high generalisation capacity and accuracy. It can either be an individual tool or a complement to deterministic approaches for enhancing the overall reliability of the ELS strategy. Its feasibility and accuracy are verified on the New England 10-machine 39-bus system, and the simulation results show that the prediction is acceptably accurate and very fast, which is promising for practical use.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available