4.7 Article

Optimal Placement of GIC Blocking Devices for Geomagnetic Disturbance Mitigation

Journal

IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 29, Issue 6, Pages 2753-2762

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2014.2309004

Keywords

Geomagnetic disturbances (GMDs); geomagnetically induced current (GIC); GIC blocking device; transformer saturation; voltage stability

Ask authors/readers for more resources

This paper presents an optimization approach for the placement of geomagnetically induced current (GIC) blocking devices (BDs) on power system transformers to mitigate the adverse effects of a geomagnetic disturbance (GMD). Solar storms lead to GMDs which, in turn, drive GICs along transmission lines and through transformer windings. GICs cause half-cycle saturation in power transformers, increase their shunt reactive power loss, lead to a significant lack of power system reactive power support, and, as a result, create voltage instability and, potentially, large-scale voltage collapse. To mitigate these detrimental effects, a long-term remedy is to install GIC BDs at the neutral point of transformers. Since these devices are fairly costly, their placement should be performed in an optimal manner. The optimization problem proposed in this paper minimizes the cost of BD placement while satisfying power system voltage and generator maximum reactive power limits. The numerical results demonstrate the effectiveness of the proposed method in maintaining an acceptable voltage profile for the power system in case of GMDs with any degree of severity.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available