4.7 Article

Optimal Scheduling of a Price-Taker Cascaded Reservoir System in a Pool-Based Electricity Market

Journal

IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 26, Issue 2, Pages 604-615

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2010.2063042

Keywords

Hill diagram; hydroelectric generation; net head; technical efficiency; water discharge

Funding

  1. Universidad Nacional de Colombia, sede Medellin, Facultad de Minas
  2. Direccion de Investigaciones de Medellin, DIME [20201007010]
  3. Ministry of Education and Science of Spain [ENE2006-02664, TPWRS-00608-2009]

Ask authors/readers for more resources

A mixed integer nonlinear programming (MINLP) model for scheduling of the short-term integrated operation of a series of price-taker hydroelectric plants (H-GENCO) along a cascaded reservoir system in a pool-based electricity market is presented. The objective of the H-GENCO can be either to maximize profit, taking into account technical efficiency, or to maximize technical efficiency, maintaining a profit level. In both cases, the efficiency can be accurately obtained using the Hill diagram supplied by turbine manufacturers. A multiple nonlinear regression analysis of the unit's technical efficiency is estimated as a quadratic function of net head and water discharge. Several case studies of realistic dimensions are described, where results indicate that a profit-based MINLP produces better results compared to an MILP model, on the other hand, higher efficiencies and water savings are obtained in the efficiency-based model.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available