4.6 Article

Placement of Synchronized Measurements for Power System Observability

Journal

IEEE TRANSACTIONS ON POWER DELIVERY
Volume 24, Issue 1, Pages 12-19

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRD.2008.2008430

Keywords

Integer quadratic programming; observability; optimal placement; phasor measurement units (PMUs); synchronized measurements

Funding

  1. Cyprus Research Promotion Foundation [ProdDeltaE/0505/06]

Ask authors/readers for more resources

This paper presents a method for the use of synchronized measurements for complete observability of a power system. The placement of phasor measurement units (PMUs), utilizing time-synchronized measurements of voltage and current phasors, is studied in this paper. An integer quadratic programming approach is used to minimize the total number of PMUs required, and to maximize the measurement redundancy at the power system buses. Existing conventional measurements can also be accommodated in the proposed PMU placement method. Complete observability of the system is ensured under normal operating conditions as well as under the outage of a single transmission line or a single PMU. Simulation results on the IEEE 14-bus, 30-bus, 57-bus, and 118-bus test systems as well as on a 298-bus test system are presented in this paper.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available