4.3 Article

Implementation of Earned Value Management Tools in the Wendelstein 7-X Project

Journal

IEEE TRANSACTIONS ON PLASMA SCIENCE
Volume 40, Issue 12, Pages 3560-3565

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPS.2012.2220784

Keywords

Assembly; diagnostic engineering; earned value management (EVM); in-vessel components (IVCs); project control

Ask authors/readers for more resources

The stellarator project W7-X, which is currently under construction, has recently implemented several earned value management tools to enable a tighter monitoring of internal processes such as the W7-X assembly process, the diagnostic engineering, and the manufacture of in-vessel components. Specification and implementation of these tools has posed several challenges characteristic of large-scale research projects that are subject to a number of changes during their life cycle. After putting these tools in operation, they have proven as early and transparent performance indicators for project control.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available