4.6 Article

Controller Design for a Large-Scale Ultrasupercritical Once-Through Boiler Power Plant

Journal

IEEE TRANSACTIONS ON ENERGY CONVERSION
Volume 25, Issue 4, Pages 1063-1070

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TEC.2010.2060488

Keywords

Gain tuning; intelligent control; modified predictive optimal control (MPOC); ultrasupercritical (USC) power plant

Funding

  1. National Science Foundation [ECCS 0801440]
  2. Doosan Heavy Industries and Construction Company Ltd.
  3. Div Of Electrical, Commun & Cyber Sys
  4. Directorate For Engineering [801440] Funding Source: National Science Foundation

Ask authors/readers for more resources

A large-scale once-through-type ultrasupercritical boiler power plant is investigated for the development of an analyzable model for use in developing an intelligent control system. Using data from the power plant, a model is realized using dynamically recurrent neural networks (NN). This requires the partitioning of multiple subsystems, which are each represented by an individual NN that when combined form the whole plant model. Modified predictive optimal control was used to drive the plant to desired states; however, due to the computational intensity of this approach, it could not be executed quickly enough to satisfy project requirements. As an alternative, a reference governor was implemented along with a PID feedback control system that utilizes intelligent gain tuning, which, while more complicated, satisfied the computational speed required for the controller to be realized.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available